Project Background
warehouseIdar, Himmatnagar, Gujarat75 Days

Industrial Warehouse – Greenex Plast Project

Industrial facility engineered and executed with precision structural steel fabrication and site execution by RF Infracon.

Project Gallery

1 of 7 Media
Industrial Warehouse – Greenex Plast Project - View 1
Location

Idar, Himmatnagar

Structure Type

warehouse

Project Duration

75 Days

Project Scope & Execution Highlights

Structural Concept & Engineering Planning
Primary & Secondary PEB Steel Structure
Precision In-House Steel Fabrication
Industrial Roofing & Cladding Systems
Civil & Foundation Interface Coordination
Safe On-Site Erection & Turnkey Handover

Project Overview & Details

Industrial Warehouse – Greenex Plast Project

This is a large-scale 40,000 sq.ft. industrial warehouse constructed using Bird Free PEB (Pre-Engineered Building) Plus Model for Greenex Plast, located in Idar and Himmatnagar, Gujarat.

The facility is specially designed for efficient storage, handling, and distribution of goods, particularly suited for industrial and manufacturing operations. It features a robust PEB structure that ensures fast construction, high durability, cost-effectiveness, and flexibility for heavy load-bearing requirements.

Key working details:

  • Built-up area: 40,000 square feet

  • Structure type: Bird Free PEB Plus Model (pre-engineered building with enhanced features for industrial use)

  • Construction / work completion time: 75 days


The warehouse supports organized pallet storage, inventory management, easy forklift movement, wide bays, and large entry points for quick loading/unloading. It is strategically located with good connectivity to highways, supporting logistics, distribution, and supply chain needs in Gujarat.

Operational Excellence

Built for High-Performance Industrial Operations

Industrial and manufacturing buildings require clear spans, robust machinery foundation load capabilities, efficient crane movement, and flexible internal space. This project was planned to ensure seamless day-to-day operations and future scalability for the client.

Direct Engineering Consultation

Planning a Similar Industrial Facility?

Share your project details with our structural engineering team for an accurate preliminary discussion and technical assessment.

Project location & land coordinates
Approximate built-up area (Sq. Ft.)
Required clear height & crane loads
Target completion timeline