Project Background
warehouseKubadthal, Gujarat45 Days

Industrial Warehouse – Proactive Engineering

Industrial facility engineered and executed with precision structural steel fabrication and site execution by RF Infracon.

Project Gallery

1 of 2 Media
Industrial Warehouse – Proactive Engineering - View 1
Location

Kubadthal

Structure Type

warehouse

Project Duration

45 Days

Project Scope & Execution Highlights

Structural Concept & Engineering Planning
Primary & Secondary PEB Steel Structure
Precision In-House Steel Fabrication
Industrial Roofing & Cladding Systems
Civil & Foundation Interface Coordination
Safe On-Site Erection & Turnkey Handover

Project Overview & Details

Industrial Warehouse – Proactive Engineering Project

This compact yet efficient 19,000 sq.ft. industrial warehouse was constructed for Proactive Engineering, a company specializing in precision grinding services, surface grinding, fettling, and various engineering job works for industrial clients. Located in Kubadthal, Ahmedabad, Gujarat, the facility supports organized storage of machinery, tools, abrasives, raw materials, finished components, and equipment essential for their grinding and engineering operations.

The warehouse features durable construction optimized for industrial use: reinforced flooring for heavy loads, wide bays for easy forklift and material handling, high ceilings for vertical storage, and large entry points for quick loading/unloading of trucks and goods.

Key working details:

  • Built-up area: 19,000 square feet

  • Structure type: Warehouse (tailored for engineering and industrial storage needs)

  • Construction / work completion time: 45 days (demonstrating rapid execution and efficiency)

Strategically built in Kubadthal's developing industrial zone, it enhances Proactive Engineering's supply chain, inventory management, and timely service delivery to clients across Gujarat's manufacturing sectors.

Operational Excellence

Built for High-Performance Industrial Operations

Industrial and manufacturing buildings require clear spans, robust machinery foundation load capabilities, efficient crane movement, and flexible internal space. This project was planned to ensure seamless day-to-day operations and future scalability for the client.

Direct Engineering Consultation

Planning a Similar Industrial Facility?

Share your project details with our structural engineering team for an accurate preliminary discussion and technical assessment.

Project location & land coordinates
Approximate built-up area (Sq. Ft.)
Required clear height & crane loads
Target completion timeline